---
name: high-tech-architecture
description: "Apply the High-tech style (1970s–1990s) when designing, describing or rendering buildings and interiors. Load when the user asks for: high-tech architecture, pompidou, rogers and piano, norman foster, hsbc building, exposed services."
domain: architecture
era: postmodern-and-after
triggers:
  - "high-tech architecture"
  - "pompidou"
  - "rogers and piano"
  - "norman foster"
  - "hsbc building"
  - "exposed services"
  - "steel and glass machine"
  - "bolted steel"
vector_profile:
  ornamentation: 1
  structural_expression: 5
  geometric_rigidity: 4
  material_rawness: 2
  monumentality: 3
---

# High-tech

> A building is a machine of parts: structure, services and circulation are tools to see and to change, and open floors let the use change.

A lightweight steel frame, with the services, the bracing and the lifts shown in colour on the outside. Rogers, Piano and Foster made the machine aesthetic of the 1920s into a flexible, kit-of-parts building.

**Period:** 1970s–1990s · **Era:** Postmodern and After · **Domain:** Architecture · **Also called:** Structural Expressionism, Late Modernism (technological)

## When to load this skill

Load it when the user asks for: "high-tech architecture", "pompidou", "rogers and piano", "norman foster", "hsbc building", "exposed services", "steel and glass machine", "bolted steel".

Good for: museum and library renders, corporate headquarters, airport and station design, science and lab buildings.

Do not use it when:
- The brief asks for domestic warmth, traditional craft or a heavy masonry building.
- The site has strong rules on a historic roofline or a quiet street front.

## System directives

When designing, describing or rendering buildings and interiors in High-tech, you MUST:

1. Free the floor plate: span 12 to 48m with trusses or tension rods, so that the interior has no columns in the use area.
2. Put services outside, on the facade or the roof: ducts, pipes, lifts and stairs, coloured by function (blue air, green water, yellow power, red escape).
3. Build from a kit of prefabricated parts: steel members, pins, castings and glass panels that are bolted, not welded on site.
4. Show the joints: bolts, pins, cast gerberettes and tension rods are the detail that carries the elevation.
5. Wrap the frame in a thin skin of glass or metal panel, with a window-to-wall ratio of 60 to 100%.
6. Plan for change: a regular bay of 6 to 12m, a raised floor of 150 to 600mm, and walls that move.

## Guardrails

Each line below breaks the style. Check your output against the list before you return it.

- **NEVER:** Services hidden in a ceiling void and a cladded riser.
- **NEVER:** Massive concrete or masonry walls.
- **NEVER:** Applied historical ornament or quotation.
- **NEVER:** Welded smooth joints that hide how the part is fixed.
- **NEVER:** Fixed plans with load-bearing partitions.
- **NEVER:** Rough, unfinished, hand-made surfaces.

## Vector profile

| Axis | Score | 1 means | 5 means |
|---|---|---|---|
| Ornamentation | `■□□□□` 1/5 | no applied ornament | ornament covers the surface |
| Structural expression | `■■■■■` 5/5 | structure hidden | structure is the image |
| Geometric rigidity | `■■■■□` 4/5 | organic / free-form | strict orthogonal module |
| Material rawness | `■■□□□` 2/5 | finished and coated | raw and unfinished |
| Monumentality | `■■■□□` 3/5 | domestic human scale | monumental |

Hold these scores. If a request moves an axis by 2 points or more, you have left the style: go to "Lineage fallbacks".

## Massing & form

- **Form:** A clear rectangular box of 3 to 8 storeys, with the stairs, lifts and ducts in separate bands or towers beside it.
- **Proportion:** Wide and low: 2:1 to 4:1 length to height; the long front is a screen of frame and glass.
- **Roof:** A flat roof with plant, masts and tension-rod trusses; the roof edge is a thin line.
- **Relation to ground:** A raised public plaza or a ground floor open on all sides, so that the building sits like a machine on a platform.

## Structure

- **System:** A steel frame with trusses, tension members and cast steel joints, on a 6 to 12m module.
- **Span and module:** Floor spans of 12 to 48m; the frame bay of 6 to 12.8m; floors are 3.5 to 4.2m storey to storey.
- **Expression:** All members are visible, from the cross-bracing to the pins; the structure is the main decoration.

## Materials

- **Primary:** painted structural steel · glass · stainless steel · aluminium panels
- **Secondary:** tensile fabric · cast steel · perforated metal · raised access floor
- **Finish:** Factory-made and exact: paint in primary colours, brushed stainless, clear glass, and bolted joints.

**Palette**

| Name | Hex | Role |
|---|---|---|
| Steel grey | `#9AA3A8` | frame and bracing |
| Signal red | `#D62D20` | circulation and escape |
| Duct blue | `#1B6EC2` | air services |
| Pipe green | `#1E9E5A` | water services |
| Glass | `#B8D4DD` | skin |

## Facade

- **Composition:** A frame of columns, bracing and floors in front of glass, with a coloured layer of services and a glazed outside escalator or stair.
- **Openings:** Full-height glazing; the window-to-wall ratio is 60 to 100%, with solid panels only at the cores.
- **Solid to void:** Void leads: 0–40% opaque, mostly as steel members and panels.

## Light & space

- **Daylight:** Light reaches deep plans through full glass fronts, rooflights and atrium; the structure casts a fine line of shadow.
- **Spatial sequence:** A free open floor reached by a long glazed escalator or a lift on the outside; the plan is a field, not a sequence.
- **Interior character:** Bare steel soffits, raised floors, movable partitions and visible services in the ceiling.

## Ornament

- **Attitude:** No applied ornament; the detail of the joint, the colour code of the services and the structure are the image.
- **Details:** cast steel gerberettes · tension rod bracing · colour-coded ducts · glazed external escalators · exposed bolts and pins

## Composition rules

- **Symmetry:** bilateral
- **Axis count:** 1
- **Rhythm module m:** 12.8

**Rules**

| Principle | Rule | Value |
|---|---|---|
| rhythm | Repeat the structural bay and the tube at an exact module. | bay 12.8m |
| layering-depth | Hang the services and the bracing outside the glass as a visible layer. | 1 outer layer |
| colour-distribution | Code each service by colour: air blue, water green, circulation red. | 4–5 codes |
| circulation | Run the escalator tube on the face as a visible diagonal. | 1 façade route |
| zoning | Keep the floor plates free of columns for flexible use. | clear span 44m |

## Reference images

**Images**

| Title | Credit | Licence | Url |
|---|---|---|---|
| Centre Pompidou, Paris | Alf van Beem | CC0 | https://commons.wikimedia.org/wiki/File:Centre_Pompidou,_seen_from_Tour_Montparnasse.jpg |

## Composition principles

The rules above name these shared principles by id. The definition is the same in every domain; the number in the rule belongs to this style. The full records are in [`data/principles/`](../../data/principles/).

| Id | Principle | Definition | Measure: typical range |
|---|---|---|---|
| `rhythm` | Rhythm and repetition | An element or an interval repeats at a regular, alternating or progressive step, and the eye moves along the series. | repeated interval (cm or px): style module; repetitions in one series (count): 3 or more; type (kind): regular, alternating, progressive |
| `layering-depth` | Layering in depth | A view holds elements on several planes at different distances from the eye. Overlap between the planes shows depth. | planes in depth (count): 2 to 4; overlap between planes (% of the nearer element): 10–40 |
| `colour-distribution` | Colour distribution | Each colour takes a planned share of the visible area: a dominant colour, a secondary colour and an accent. | dominant / secondary / accent share (% of visible surface): 60/30/10 as the default; 70/25/5 calm; 40/35/25 bold; accents (count): 1 to 3 |
| `circulation` | Circulation | The routes through a space and the clear widths that they keep free of furniture. | main route clear width (cm): 90–120; secondary route clear width (cm): 60–75; seat edge to low table (cm): 35–50; wheelchair route (cm): 90 or more; 150 turning circle |
| `zoning` | Zoning | A space divides into areas with one activity each. A rug, a light, a ceiling change or a group of furniture marks a zone without a wall. | zones in one open room (count): 2 to 4; zone marker (kind): rug, pendant, floor level, ceiling level, furniture back |

## Vocabulary primer

Use these terms in a brief, an image prompt or a 3D scene description.

- **Use:** exposed steel structure, colour-coded service ducts, tension rod bracing, glass curtain wall, external escalator, bolted cast steel joints, column-free open floor, atrium, kit of parts
- **Exclude:** masonry wall, classical ornament, pitched roof, hidden services, rustic timber, pastel stucco

Reference works:

| Work | Maker | Year |
|---|---|---|
| Centre Pompidou, Paris | Renzo Piano and Richard Rogers | 1977 |
| Lloyd's Building, London | Richard Rogers | 1986 |
| HSBC Main Building, Hong Kong | Norman Foster | 1985 |
| Sainsbury Centre, Norwich | Norman Foster | 1978 |
| Inmos Microprocessor Factory, Newport | Richard Rogers | 1982 |

## Techniques

These techniques started in one domain and moved into this style. Apply the rules as they are written; the full record is in [`TECHNIQUES.md`](../TECHNIQUES.md).

### Curtain wall (technology)

A thin outer wall of glass and metal that hangs on the frame of the building and carries no floor load. Origin: architecture, San Francisco, United States, 1918.

- Carry the floors on columns set 1 to 3 m back from the facade line.
- Hang the glass in a grid of mullions at 1.2 to 1.5 m centres.
- Keep the glass part of the facade above 60%.

### Exposed services (process, invented here)

Ducts, pipes, stairs and cables stay in view on the outside or the ceiling, often colour-coded, so the building shows how it works. Origin: architecture, Paris, France, 1977.

- Leave each duct, pipe and cable tray in view; paint them or leave them raw metal.
- Give each system one colour: for example blue for air, green for water, yellow for electricity.
- Keep the floor plate free; put the services on the facade or the ceiling.

## Organisations

The groups, studios, companies, schools, channels and backers that carried this style.

- **Archigram** (crew, London, 1960–1974), shaped the style. A group of six young London architects who published a magazine of cities as machines. They drew walking cities, plug-in frames and living pods, but built almost nothing.
- **Hyatt Foundation** (foundation, Chicago, ?–now), funded the style. Sponsor of the Pritzker Architecture Prize. The Pritzker family funds the prize, which it founded in 1979.
- **Team 4** (studio, London, 1963–1967), made the style. A small architecture practice of Norman Foster, Richard Rogers and two partners. Its factory building at Swindon used light steel and glass in the way of the later high-tech.

## Permutations

Each knob varies the style inside a range where it stays itself. Keep each value in its range. `npm run permute -- <id> key=value` writes the tokens for other values.

| Knob | Default | Range | Changes |
|---|---|---|---|
| Storey height (`storey_height`) | 3.9 | 3.5–4.2 m | massing, facade |
| Structural grid (`structural_grid`) | 12 | 6–30 m | structure |
| Glazing ratio (`glazing_ratio`) | 80 | 60–100 % | facade, light_and_space |
| Roof pitch (`roof_pitch`) | 0 | 0–3 deg | massing |
| Base material (`base_material`) | steel | steel, glass | materials |

## Lineage fallbacks

When the user asks for a variation, do not improvise. Blend toward the neighbour named here, and load its skill.

- If the user asks for **heavier**: move toward [`brutalist-architecture`](../brutalist-architecture/SKILL.md) (Brutalism). Replace the steel frame with cast concrete members of the same grid, show services in a concrete tower, and reduce the glazing to 40%.

- **Came from (go here for a more orthodox version):** [`international-style-architecture`](../international-style-architecture/SKILL.md)
- **Mixes well with:** [`deconstructivist-architecture`](../deconstructivist-architecture/SKILL.md), [`radical-architecture`](../radical-architecture/SKILL.md)
- **Kin in another domain:** [`cassette-futurism`](../cassette-futurism/SKILL.md), [`industrial-loft-interior`](../industrial-loft-interior/SKILL.md), [`industrial-utility-product`](../industrial-utility-product/SKILL.md), [`luxury-steel-sports-watch`](../luxury-steel-sports-watch/SKILL.md), [`space-age`](../space-age/SKILL.md), [`technical-shell-alpinism`](../technical-shell-alpinism/SKILL.md), [`terracotta-rainscreen`](../terracotta-rainscreen/SKILL.md)
- **Nearest by vector profile:** [`metabolism-architecture`](../metabolism-architecture/SKILL.md), [`bauhaus-architecture`](../bauhaus-architecture/SKILL.md), [`mass-timber-architecture`](../mass-timber-architecture/SKILL.md)

## Emotional target

Energy and openness: the viewer feels a machine that works in public and welcomes change.

**Keywords:** technical, transparent, flexible, precise, energetic · **Brand archetypes:** explorer, creator

## Sources

- [Wikidata Q845318, high-tech architecture (CC0)](https://www.wikidata.org/wiki/Q845318)
- [Getty AAT 300060022, High-Tech (ODC-By 1.0)](https://vocab.getty.edu/page/aat/300060022)
- Colin Davies, High Tech Architecture (Thames & Hudson, 1988)

---

Generated from [`data/architecture/styles/high-tech-architecture.json`](../../data/architecture/styles/high-tech-architecture.json) by [design-ontology](../../README.md). Do not edit this file; change the data and run `npm run build`.
